EV Charging Station Installation
California's fleet and workplace charging mandates are accelerating. Nuon Energy designs and installs Level 2 workplace charging and DC fast charging for fleets, multifamily properties and retail sites — with or without solar and storage tied in.

The Nuon Standard for
ev charging.
We work with ChargePoint, EVgo-compatible hardware, Wallbox and Tesla equipment, and handle the full electrical scope: service upgrades, sub-metering, load management, and network configuration for billing and access control.
Where utility incentives (SDG&E Power Your Drive, SCE Charge Ready) apply, we manage the incentive application end-to-end so you capture every dollar available.
Level 2 for workplace and multifamily
50–350 kW DC fast charging for fleets
Load management + submetering built in
Utility incentive application handled by us
EV charging station installation services
We install options for home, commercial, and smart charging that match different budgets, power needs, and site constraints. Each project covers permitting, equipment selection, and safe electrical work to get chargers running reliably from day one.
Commercial charging infrastructure
You can add Level 2 or DC fast chargers at workplaces, apartments, or retail lots to serve employees, residents, or customers. Commercial installs include site planning for traffic flow, ADA access, and conduit runs to multiple stalls.
We handle utility coordination, permits, and the layout drawing. Every project ships with an expected charging power per stall and a documented utilization plan before you sign.
Smart charging technology and networks
Smart chargers let you schedule sessions, track energy, and reduce demand charges through load balancing. We standardize on open-protocol (OCPP) hardware so you keep flexibility on management software and future vendor changes.
Rebates and incentives for California sites
You can stack federal tax credits with California and San Diego programs to significantly cut up-front cost. Programs like CALeVIP, SDG&E Power Your Drive, and SCE Charge Ready cover make-ready costs, equipment, and installation for qualifying sites.
We manage the incentive application end-to-end — application, documentation, and reservation — so you don't leave dollars on the table.
Choose the right charging tier for your site
We deliver Level 2 for workplace and multifamily, and DC fast charging for fleet and public sites. Every install includes load management and open-protocol networking.
Level 2
Workplace + multifamily
Ideal for workplaces, apartments and destination sites where vehicles sit 4+ hours
DC Fast
Fleet + retail
Ideal for fleet depots, retail centers and highway corridors needing sub-30-min charging
Solar + Storage
Peak-shaved charging
Ideal for sites with high demand charges or limited utility service capacity
